dc.contributor.author |
Velasco, Giuliana Del Nero |
|
dc.contributor.author |
Lima, Ana Maria Liner Pereira |
|
dc.contributor.author |
Couto, Hilton Thadeu Zarate do |
|
dc.date.accessioned |
2014-10-01T18:26:01Z |
|
dc.date.available |
2014-10-01T18:26:01Z |
|
dc.date.issued |
2006 |
|
dc.identifier.citation |
VELASCO, G. D. N.; LIMA, A. M. L. P.; COUTO, H. T. Z. Análise comparativa dos custos de diferentes redes de distribuição de energia elétrica no contexto da arborização urbana. Revista Árvore, Viçosa, v. 30, n. 4, p. 679-686, 2006. |
pt_BR |
dc.identifier.issn |
1806-9088 |
|
dc.identifier.uri |
http://www.bibliotecaflorestal.ufv.br/handle/123456789/11691 |
|
dc.description.abstract |
Com o intuito de estudar as podas feitas em árvores urbanas e analisar novas técnicas possíveis de serem utilizadas para reduzir o número de podas e melhorar a convivência das espécies com a fiação elétrica, além de permitir à árvore desempenhar plenamente suas funções ecológicas, buscou-se levantar dados referentes aos três tipos principais de redes de distribuição de energia elétrica (aérea convencional, aérea compacta e subterrânea), em quatro concessionárias de energia elétrica, a fim de compilá-los em um só trabalho. Foram levantados custos de implantação das redes convencional, compacta e subterrânea, assim como custos de manutenção e de poda de árvores. O custo de implantação de rede convencional (primária e secundária) variou de R$54.188,39 a R$67.571,43. O custo de implantação da rede compacta (primária e secundária) foi em média R$62.215,99. Já o custo de implantação de uma rede subterrânea é, em média, de R$436.585,04. A rede compacta já é totalmente viável, principalmente por ter custo de implantação praticamente igual à rede convencional e ter custo de manutenção 80% menor. A rede subterrânea, embora com custo de implantação aproximadamente 10 vezes maior quando comparado com o custo da convencional, por ter reduzido custo de manutenção e alta confiabilidade do sistema elétrico, seu uso já pode ser viável em diversas ocasiões. |
pt_BR |
dc.description.abstract |
In order to study the pruning carried out in urban trees and analyze new techniques that may be used to reduce pruning, improve the relationship between the species and the networks, and allow trees to fulfill their proper ecological functions, studies concerning the three main types of electric power distribution were carried out: aerial conventional distribution networks, aerial compact distribution networks and underground networks in four electric power companies. The study showed the implementation costs of the three named networks as well as pruning and tree maintenance costs. The costs of the conventional network (primary and secondary) ranged from R$ 54.188,39 to R$ 67.571,43. The costs for the compact network (primary and secondary) was on average R$ 62.215,99, and the costs for the underground networks was on average R$ 436.585,04. The compact network is now possible, mainly because its implementation costs are almost the same of the conventional network and its maintenance costs are 80% lower. Although the implementation costs of the underground network is 10 times higher than the conventional one, its lower maintenance costs and high reliability allow its use in several situations. |
pt_BR |
dc.format |
8 páginas |
pt_BR |
dc.language.iso |
pt_BR |
pt_BR |
dc.publisher |
Sociedade de Investigações Florestais |
pt_BR |
dc.relation.ispartofseries |
Revista Árvore:v.30,n.4; |
|
dc.subject.classification |
Ciências Florestais::Meio ambiente::Planejamento paisagístico |
pt_BR |
dc.subject.classification |
Ciências Florestais::Manejo florestal::Economia e otimização florestal |
pt_BR |
dc.title |
Análise comparativa dos custos de diferentes redes de distribuição de energia elétrica no contexto da arborização urbana |
pt_BR |
dc.title |
Costs of aerial electricity conventional distribution networks, aerial compact distribution networks and underground networks in arboriculture context |
pt_BR |
dc.type |
Artigo |
pt_BR |