Biblioteca Florestal
Digital

Análise técnica e econômica do forwarder em três subsistemas de colheita de florestas de eucalipto

Mostrar registro simples

dc.contributor.author Minette, Luciano José
dc.contributor.author Moreira, Fábio Murilo Tieghi
dc.contributor.author Souza, Amaury Paulo de
dc.contributor.author Machado, Carlos Cardoso
dc.contributor.author Silva, Kátia Regina
dc.date.accessioned 2014-11-20T13:10:49Z
dc.date.available 2014-11-20T13:10:49Z
dc.date.issued 2004
dc.identifier.citation MINETTE, L. J. et al. Análise técnica e econômica do forwarder em três subsistemas de colheita de florestas de eucalipto. Revista Árvore, Viçosa, v. 28, n. 1, p. 91-97, 2004. pt_BR
dc.identifier.issn 1806-9088
dc.identifier.uri http://www.bibliotecaflorestal.ufv.br/handle/123456789/12854
dc.description.abstract O objetivo deste trabalho foi avaliar técnica e economicamente o forwarder em três subsistemas de colheita em florestas de eucalipto. A análise técnica englobou um estudo de tempos e movimentos e de produtividade. A análise econômica englobou os parâmetros custo operacional, custo de produção e rendimento energético. O elemento carregamento abrangeu mais de 80% do tempo total, em todos os subsistemas. Os tempos dos elementos viagem vazio e viagem carregado foram influenciados principalmente pela distância média a ser percorrida. Chegou-se ao custo operacional de US$60,70/he. Os custos de produção do forwarder foram de 1,74, 1,53 e 2,51 US$/m3cc, nos subsistemas 1, 2 e 3, respectivamente; e o rendimento energético foi de 2,76, 2,42 e 3,98 g/kW*m3cc, nos subsistemas 1, 2 e 3, respectivamente. pt_BR
dc.description.abstract This work aimed to evaluate a forwarder, technically and economically, under three eucalyptus forest harvest subsystems. The technical analysis included a productivity and motion and time study. The economic analysis included the parameters operational cost, production cost and energy consumption. Loading consumed more than 80% of the total cycle time in the subsystems studied. The average travel distance influenced unloaded and loaded travel times. The forwarder’s operational cost was US $ 60.70/ha. The forwarder production costs were US$ 1.74 , 1.53 and 2.51 /m3cc, in subsystems 1, 2 and 3, respectively. The energy consumption rates were 2.76; 2.42 and 3.98 g/kW*m3 cc, (FORMATAR )in subsystems 1, 2 and 3, respectively. pt_BR
dc.format 7 páginas pt_BR
dc.language.iso pt_BR pt_BR
dc.publisher Sociedade de Investigações Florestais pt_BR
dc.relation.ispartofseries Revista Árvore:v.28,n.1;
dc.subject.classification Ciências Florestais::Manejo florestal::Economia e otimização florestal pt_BR
dc.subject.classification Ciências Florestais::Manejo florestal::Mecanização florestal pt_BR
dc.title Análise técnica e econômica do forwarder em três subsistemas de colheita de florestas de eucalipto pt_BR
dc.title Technical and economic analysis of a forwarder under three eucalyptus forest harvest subsystems pt_BR
dc.type Artigo pt_BR

Arquivos deste item

Arquivos Tamanho Formato Visualização
Revista_Arvore_v28_n1_p91-97_2004.pdf 189.0Kb application/pdf Visualizar/Abrir ou Pre-visualizar

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Buscar em toda a Biblioteca


Sobre a Biblioteca Florestal

Navegar

Minha conta