Biblioteca Florestal
Digital

Avaliação operacional e econômica do “feller-buncher” em dois subsistemas de colheita de florestas de eucalipto

Mostrar registro simples

dc.contributor.author Moreira, Fábio Murilo Tieghi
dc.contributor.author Souza, Amaury Paulo de
dc.contributor.author Machado, Carlos Cardoso
dc.contributor.author Minetti, Luciano José
dc.contributor.author Silva, Kátia Regina
dc.date.accessioned 2014-11-21T12:46:37Z
dc.date.available 2014-11-21T12:46:37Z
dc.date.issued 2004
dc.identifier.citation MOREIRA, F. M. T. et al. Avaliação operacional e econômica do “feller-buncher” em dois subsistemas de colheita de florestas de eucalipto. Revista Árvore, Viçosa, v. 28, n. 2, p. 199-205, 2004. pt_BR
dc.identifier.issn 1806-9088
dc.identifier.uri http://www.bibliotecaflorestal.ufv.br/handle/123456789/12888
dc.description.abstract O objetivo deste trabalho foi avaliar técnica e economicamente o feller-buncher em dois subsistemas de colheita em florestas de eucalipto. A análise técnica englobou um estudo de tempos e movimentos e de produtividade. A análise econômica englobou os parâmetros custo operacional, custo de produção e rendimento energético. O elemento parcial que consumiu a maior parte do tempo do ciclo operacional foi o busca e corte, com aproximadamente 50% do tempo total do ciclo nos dois subsistemas. Os elementos deslocamento vazio e descarregamento consumiram cerca de 39% do tempo total do ciclo do feller-buncher. O custo operacional do feller-buncher foi de US$55,27/he; os custos de produção foram de 1,69 e 1,55 US$/m3cc, nos subsistemas 1 e 2, respectivamente; e o rendimento energético foi de 4,45 e 4,09 g/kW*m3cc, nos subsistemas 1 e 2, respectivamente. pt_BR
dc.description.abstract This work aimed to evaluate a feller-buncher operationally and economically, under two eucalyptus forest harvest subsystems. The operational analysis included a productivity and motion and time study. The economic analysis included the parameters operational cost, production cost and energy consumption. Searching and cutting consumed most of the operational time, approximately 50% of the total cycle time in both subsystems. Empty displacement and unloading consumed together about 39% of the total feller-buncher cycle time. The feller-buncher operational cost was US$55.27/he. The production costs were US$1.69 and 1.55/m3cc in subsystems 1 and 2, respectively. The energy consumption rates were 4.45 and 4.09 g/kW*m3cc in subsystems 1 and 2, respectively. pt_BR
dc.format 7 páginas pt_BR
dc.language.iso pt_BR pt_BR
dc.publisher Sociedade de Investigações Florestais pt_BR
dc.relation.ispartofseries Revista Árvore:v.28,n.2;
dc.subject.classification Ciências Florestais::Manejo florestal::Economia e otimização florestal pt_BR
dc.subject.classification Ciências Florestais::Manejo florestal::Mecanização florestal pt_BR
dc.title Avaliação operacional e econômica do “feller-buncher” em dois subsistemas de colheita de florestas de eucalipto pt_BR
dc.title Technical and economic analysis of a feller-buncher in two harvest subsystems of eucalyptus forests pt_BR
dc.type Artigo pt_BR

Arquivos deste item

Arquivos Tamanho Formato Visualização
Revista_Arvore_v28_n2_p199-205_2004.pdf 124.4Kb application/pdf Visualizar/Abrir ou Pre-visualizar

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Buscar em toda a Biblioteca


Sobre a Biblioteca Florestal

Navegar

Minha conta