dc.contributor.author |
Silva, Elizabeth Neire da |
|
dc.contributor.author |
Machado, Carlos Cardoso |
|
dc.contributor.author |
Fiedler, Nilton Cesar |
|
dc.contributor.author |
Fernandes, Haroldo Carlos |
|
dc.contributor.author |
Paula, Marcos Oliveira de |
|
dc.contributor.author |
Carmo, Flávio Cipriano do |
|
dc.contributor.author |
Moreira, Gisele Rodrigues |
|
dc.contributor.author |
Coelho, Fernando Eugênio |
|
dc.date.accessioned |
2014-11-27T13:29:32Z |
|
dc.date.available |
2014-11-27T13:29:32Z |
|
dc.date.issued |
2014 |
|
dc.identifier.citation |
SILVA, E. N. et al. Avaliação de custos de dois modelos de “harvester” no corte de eucalipto. Ciência Florestal, Santa Maria, v. 24, n. 03, p. 741-748, jul./set. 2014. |
pt_BR |
dc.identifier.issn |
0103-9954 |
|
dc.identifier.uri |
http://www.bibliotecaflorestal.ufv.br/handle/123456789/13017 |
|
dc.description.abstract |
O presente estudo teve o objetivo de realizar a avaliação de custos de dois modelos de harvester, na colheita de madeira de eucalipto. A pesquisa avaliou a derrubada e o processamento da árvore, com idade de 6 anos, no sistema de toras curtas, para dois modelos de harvester, em áreas localizadas nos municípios de Conceição da Barra – ES e Caravelas – BA. Avaliaram-se dois modelos de harvester, PC-228 SHO e PC-200 LC, da marca Komatsu. As informações foram coletadas durante um período de 6 meses, que compreende os meses de março a agosto de 2010, pelo método de censo. Calcularam-se os custos operacionais dos dois modelos de harvester, pelo método contábil, o qual utiliza valores estimados em reais. Realizou-se ainda a análise de sensibilidade de custos para os elementos que mais contribuem com o custo final. Obteve-se o custo operacional para os modelos PC 200 e PC 228 de R$ 156,95 e R$ 168,84 por hora efetiva, respectivamente. Em relação aos custos operacionais totais, os custos mais significativos foram: combustível, manutenção e reparos e depreciação, com 24,41%, 22,39% e 19,08%, respectivamente. Na análise de sensibilidade, simulando uma situação em que a empresa consiga uma economia real de 10% em cada um desses itens, a mesma poderá obter uma redução no custo de produção em 7%, para as duas máquinas avaliadas. |
pt_BR |
dc.description.abstract |
The present study aimed to carry through the evaluation of costs of two models of harvester in the wood harvesting of Eucalyptus wood. The research evaluated the 6-year old tree fallen and processing, in the cut-to-length system for two models of harvester, in areas located in the cities of Conceição da Barra, Espírito Santo state and Caravelas, Bahia state. It was evaluated the models of harvester PC-228 SHO and PC-200 LC, of the Komatsu Mark. The information was collected during a period of 6 months, from March to August 2010, by the method of census. It was calculated the operational costs of the two models of harvester, for the countable method, which uses values in ‘Reais’, the Brazilian currency. It was conducted further analysis of cost sensitivity for the elements that contribute most to the final cost. We obtained the operating cost models for PC 200 and PC 228 of R$ 156,95 and R$ 168,84 per effective hour, respectively. In relation with the total operational costs, the most significant costs were: fuel, maintenance, and repairs/ depreciation, with 24.41%, 22.39% and 19.08%, respectively. In the sensitivity analysis, simulating a situation where the company gets a real economy of 10% in each one of these items, the same one will be able to get a reduction in the cost of production in 7%, for the two evaluated machines. |
pt_BR |
dc.format |
08 páginas |
pt_BR |
dc.language.iso |
pt_BR |
pt_BR |
dc.publisher |
Universidade Federal de Santa Maria |
pt_BR |
dc.relation.ispartofseries |
Ciência Florestal:v.24,n.3; |
|
dc.subject.classification |
Ciências Florestais::Manejo florestal::Mecanização florestal |
pt_BR |
dc.title |
Avaliação de custos de dois modelos de “harvester” no corte de eucalipto |
pt_BR |
dc.title |
Evaluation of costs of two harvester models in the cut of Eucalyptus |
pt_BR |
dc.type |
Artigo |
pt_BR |